Thursday, June 28, 2012

Tank Study

Tank Study
This is the second in a series of get better at vehicles/mechanics.  This study took about 6 hours also.  I think things went a bit faster doing this.  

Tuesday, June 26, 2012

Helicopter Study

Helicopter Study
I decided to do a series of vehicle / machine studies to work on my edges and get some workflow going.  I have actually avoided doing these kinds of things but I want to start working on these kinds of things.  Because of the nature of these studies I am going to spend longer than the unusual 2- 2.5 hours I would spend on these things.  This one took about 6 hours I think. 

Sunday, June 24, 2012

Bloodsports 12 Final

Bloodsports 12 Final


Here is the final label designs for the Bloodsports 12 challenge.  
Below are the 4 variants plus the labels printed on bottles.




What I learned - I should have printed these at actual size earlier to check readability.  The mountain images should have been larger, reduced the size of surrounding graphics and I probably put some white on the title text to make it pop more. 

Saturday, June 23, 2012

Carrauntoohil

Carrauntoohil


Carrauntoohil  the highest mountail on the island of Ireland (3406 ft).  Number 4 in the series.  Now that these were complete I went ahead and completed work on the rest of the label.

Friday, June 22, 2012

Thursday, June 21, 2012

Mweelrea


Mweelrea


Mweelrea (in Connemara) was the second mountain.  Both the previous one and Donaard I had made using a value study then adding colour.  Two more to go!









Wednesday, June 20, 2012

Slieve Donard



Slieve Donard
Slieve Donard

This was the second image I worked on.  I then went and started generating a mock up.  Not very exciting at all so I decided to change approach.





Big Bear Game Art

  I started creating a series of promotional art for a ficticious game.  This was to practice going through the design process.  I have foun...